Lead-hazard containment enclosure built beneath a highway underpass for bridge coating removal

Bridge & Structural Lead Paint Removal

AMPP QP2-accredited hazardous-coatings removal for bridges, structural steel, and aging infrastructure.

Lead Removal Is a Credentialed Trade

Lead paint removal from a bridge or a piece of structural steel calls for the right accreditation before anyone bids the work. AMPP QP2 is the company-level credential that qualifies a contractor to remove and manage hazardous coating material, including lead, in the field, and it's what most CTDOT and municipal specifications require before a crew touches a lead-coated structure. Cristiano & Son holds QP2 accreditation, with QP1 field-application accreditation as its formal prerequisite. Field crews carry AMPP's C3 lead-removal training, plus C5 refresher training on top.

What QP2 Covers

AMPP's QP2 program evaluates whether a contractor has the equipment, trained personnel, and quality-control systems to safely remove hazardous coatings, lead and chromium among them, from industrial and infrastructure surfaces. On our jobs that means full environmental containment, abrasive blasting to the specified surface standard, blast-media recovery, EPA-compliant disposal, and re-coat application, handled in a single mobilization instead of staged across separate contracts.

Recent Work: Hartford CTDOT Pin-and-Hanger Project

Our crews are currently performing lead-hazard abatement on an active CTDOT pin-and-hanger bridge project in Hartford, partnering with Rotha Contracting on-site. The work includes containment setup, abrasive blast cleaning of a lead-containing coating system, and protective re-coating, staged on a nighttime lane-closure schedule so traffic keeps moving through the workday.

Who This Is For

This page covers bridge and structural lead abatement, not residential lead-paint work. If you're a DOT project manager, general contractor, or engineer scoping a bridge recoat, deck rehab, or structural steel job with an existing lead-based coating system, this is the accreditation and process to confirm before you shortlist a subcontractor.

Active Field Work

Lead Abatement on the Job

Containment, blast cleaning, and PPE protocol from an active Hartford CTDOT bridge project.

Full environmental containment enclosure set up for lead-hazard abrasive blasting on a CTDOT bridge in Hartford
Full Containment Setup

Environmental enclosure staged ahead of abrasive blasting on the Hartford pin-and-hanger bridge project, with Rotha Contracting.

Lead-hazard containment enclosure built beneath a highway underpass for bridge coating removal
Underpass Containment

Containment built to keep blast media and lead-coating debris off the roadway below during an active lane closure.

Cristiano and Son crew member in full respirator and PPE working inside a lead-hazard containment enclosure
Crew in Full PPE

Respirator and full PPE inside the containment enclosure during hazardous-coatings removal.

Historic iron truss bridge at sunset with crew on deck during structural restoration

Ready to Start Your Next Project?

From bridge restoration to highway guardrail installation, we bring 25 years of infrastructure expertise to every project. MBE certified in Connecticut and Rhode Island.